Building a swimming pool and jacuzzi is one of the activities that requires special expertise. Both in terms of design and implementation. Naturally, one part of the design is related to the mechanical and hydraulic system of the pool and the other part of the design is related to the structure and architecture of the project.
Pool construction steps
Soil leveling
After digging the pool area and completing the digging operation, in the next stage, the soil is leveled to continue the construction work and the pool floor construction begins. This operation includes leveling the pool floor along with compacting the sand and soil of the pool floor, which must be done by compacting devices.
Pool reinforcement
If you need to build a concrete pool after leveling the pool floor, the next step is pool reinforcement, which should be done according to the technical conditions of the pool and accurate calculations of the weight of the structure. Choosing the type of reinforcement and the way they are arranged is very influential in the final quality of the work, and it is definitely necessary to use expert teams in this matter.
Swimming pool plumbing
At this stage, utmost care should be taken in making the connections, because the network of the pool facilities remains under the concreting and it is very difficult to repair or rebuild it. Make sure that all the required piping network is installed and tested for pressure and leakage.

Pool lights and pool wiring
Pool concreting
The most important operation in the concrete pool construction phase is the concreting of the pool. Special sensitivity in pool concreting and the use of concrete strengthening materials, especially concrete super-lubricants and concrete fibers can increase the mechanical strength of concrete and pool sealing in the concreting stage.
Pool sealing or pool insulation
Pool sealing, whether after building a concrete pool or after building a pool with blocks, is mandatory and necessary and must be done with special sensitivities. Pool isolation is one of the most sensitive stages of pool construction.
Swimming pool tiling
The pool construction contractor is responsible for the final quality of pool tiling. Swimming pool tiling is different from all other tiling. Do not leave the swimming pool tiling operation to someone who has learned normal tiling.