One of the important things that should be paid special attention to when building a pool is the pool facilities. Swimming pool facilities are related to the placement of electronic devices and mechanical tools in the swimming pool.
Design of swimming pool installations
The first part of the hydraulic system
This part includes pipes and fittings and in general the plumbing system of the water collection, whose task is to collect, transport and pass water from different parts such as the treatment plant and engine house. In fact, the water is collected from the pool and jacuzzi bowl by the piping system and directed to the engine room, and after passing through all the engine room equipment, it returns to the pool and jacuzzi bowl.
The remarkable point about the hydraulic system of swimming pool and jacuzzi facilities is that the material of pipes and fittings used must be made of UPVC or hardened PVC. Because this material has all the standards of water supply and is completely suitable for transporting drinking water in terms of health.
The second part of the equipment
This part includes purification equipment, disinfection equipment, and heating and cooling equipment, all of which are assembled in series or sometimes in parallel with a standard and pre-defined order, and each of them performs different actions such as disinfection, They perform physical and chemical purification and heating or cooling water respectively.
This part includes purification equipment, disinfection equipment, and heating and cooling equipment, all of which are assembled in series or sometimes in parallel with a standard and pre-defined order, and each of them performs different actions such as disinfection, They perform physical and chemical purification and heating or cooling water respectively.
Managed by: Ali Rajabi

